Uppdated information: Händelö bridge closed for vessel traffic on May 13 between 9-14 hrs
The previously communicated closure of the Händelö Bridge only affects vessel traffic. Vehicle traffic directed over the bridge will not be affected. The Municipality of Norrköping is conducting maintenance work on the Händelö B [...]
5 March – Strong winds with risk of traffic restrictions or stoppages in the container terminal
On Wednesday, March 5, strong winds are expected at Port of Norrköping. The port’s container terminal holds approximately 3,500 shipping containers, stacked up to five high. </b> During strong winds, there have been instan [...]
Important Update: New Bank and IBAN Details
We want to inform you that as of May 2, 2025, we are switching banks, which means our IBAN and BIC numbers will change. New payment details (effective May 2, 2025): Bank: Nordea BIC: NDEASESS IBAN: SE1395000099603421475637 Pleas [...]
News from Swedish Customs
Container/breakbulk Pampus Terminal code VJ5P Find more information and codes here [...]
Repair works at E.on may color water green in Pampus
Starting Saturday, October 12, and for approximately one month, E.ON will be conducting work on its district heating tank. Water from the tank will be discharged into Bråviken through a pipe system that leads to Pamus. The water [...]
Asphalting in the Pampus Terminal and in our Trailer Area
During the period 21st-27th of October, asphalting will take place in and around Pampusterminalen as well as in our Trailer Area. Please drive with extra caution and adhere to the speed limits. We thank you for your patience dur [...]
Paving work at rail crossing during night
The night between Thursday, September 12th and 13th (10:00 PM – 5:00 AM), paving work will take place at the rail crossing at Pampus Terminal's Gate B, which will be closed during that time. Since the work is being carried out a [...]
Our operations are back to normal, 26 july
The IT disruptions that affected us this morning have now been resolved, and our operations are back to normal. We apologize for any possible delays this caused and appreciate your understanding. [...]
Quays 57-59 closed for loading and unloading of ships from August 5th to September 1st.
The work on stormwater management at the Öhman Terminal is progressing. From Monday, August 5th until Sunday, September 1st, excavation will be carried out along quays 57-59 (from bollard 159). This means that during this period [...]
Traffic disruption on Energigatan 9, 10, 15 July
E.ON is carrying out work along 'Energigatan' July 9th The existing roof will be removed from the tank for district heating water on the morning of July 9th. This work should not cause traffic problems, but driving extra careful [...]